This setup guide contains installation information about the BCK SF 26CT back-can. When installed and assembled together with
the DAK SF 26CT, they become a fully functional SF 26CT SoundField
The complete assembly can be installed by a single-trade installation or a multi-trade installation procedure (see the SF 26CT
User Guide, available at www.extron.com, for details). The entire assembly is plenum rated.
WARNING: Potential risk of severe injury. Installation and service must be performed by authorized personnel only.
AVERTISSEMENT:
par le personnel autorisé uniquement.
NOTE: Installation of conduit and conduit adapters must conform to all applicable building codes and local ordinances.
Installing the BCK SF 26CT into a Suspended Ceiling
Preparing the Installation Location
Power down all attached devices before proceeding.
1.
Using the provided cutout template for the outline, cut
2.
a hole for the BCK SF 26CT in the ceiling tile, as
described below.
NOTE: For hard ceiling installations:
Skip steps a through e and just use the
template to cut a hole in the ceiling.
Remove the ceiling tile, and draw diagonal lines
a.
across it from opposite corners to locate its center.
Mark the intersection where the lines cross.
Position the center hole of the cutout template
b.
directly over the center of the tile, marked in
step 2a.
Trace a circle on the ceiling tile around the cutout
c.
template.
Cut out the circle traced in the ceiling tile.
d.
Replace the ceiling tile in the ceiling.
e.
Attach two V-rails and one C-ring above the hole cut
3.
in step 2, as described below.
NOTE: For hard ceiling installations:
Fold one C-ring assembly in half and insert it
through the hole in the ceiling.
Unfold the C-ring and center it over the hole
with the flat side down.
V-rails are not needed.
Assemble two V-rail half sections by fitting the tab
a.
of one end into the slot of the other end. Open the
V-rail until it locks together (see figure 1). Repeat
this procedure for the other V-rail.
For ease of access, Remove a ceiling tile adjacent
b.
to the cut tile.
Place both assembled V-rails on the cut ceiling tile
c.
and position them equally on either side of the hole.
The ends of the V-rails go over the ceiling grid (see
figure 2, on next page).
Risque potentiel de blessure grave ou de mort. L'installation et l'entretien doivent être effectués
®
XD 2-way speaker.
Assembling the V-rails
Figure 1.
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the BCK SF 26CT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Extron electronics BCK SF 26CT

  • Page 1 BCK SF 26CT • Setup Guide This setup guide contains installation information about the BCK SF 26CT back-can. When installed and assembled together with the DAK SF 26CT, they become a fully functional SF 26CT SoundField ® XD 2-way speaker.
  • Page 2 BCK SF 26CT • Setup Guide (Continued) Position the C-ring assembly on the two V-rails so that the C-ring is centered over the hole. C-ring Secure the C-ring to the V-rails using two screws (see figure 2). Route the speaker wires through the ceiling tile hole.
  • Page 3 Use one of three methods to attach the speaker Wiring Multiple Speakers Using Loop-through wires to the captive screw connector, depending on When a chain of speakers is wired this way, the configuration (see figure 6). disconnecting one speaker removes power from all downstream speakers.
  • Page 4 BCK SF 26CT • Setup Guide (Continued) Mount the speaker back can enclosure NOTE: For hard ceiling installations: Attach the secondary support line (step 8, on the next page) prior to mounting the speaker back can enclosure in the hard ceiling.
  • Page 5 BCK SF 26CT • Setup Guide (Continued) ATTENTION: Anchor end to suitable • To avoid damaging or deforming soft ceiling secure points within the material, tighten the locking arms to secure solid and permanent the speaker, but do not overtighten to prevent building structure.