Maintenance Intervals - Wilo EMU FA+HC20.1 Series Installation And Operating Instructions Manual

Table of Contents

Advertisement

Technical data:
Production
Status
stopped
Product name
Thermofrost
Company
BP
Monopropylene
Basis
glycol
Color
None
Purity
80% - 94.99%
Density
1.056 g/ml
Boiling point
140 °C
pH value
7.9
Water
3% - 9.99%
Nitrite
None
Amine
-
Phosphate
-
Silicate
-
Water hazard
1
class
FDA approval
-
HT1 approval
-
Afssa approval
-
Remarks
-
Table 7-2: Technical Data – Glycol Overview
Overview of the maintenance intervals needed:
- Checking the insulation resistance
- Fill level check in cooling system - fill level must be between the minimum and the maximum
marks on the cooling jacket
- Fill level check in sealing chamber – lubricant must reach up to the lower edge of the filling
opening
- Monitoring the current consumption and voltage
- Checking the used relays for posistors, sealing room monitor, etc.
- Visual inspection of the power supply cable
- Visual inspection of the cable holder and the cable bracing
E:\shares\Baprod\BA\subtec_m\sewage\us\hc\maintenance.fm
Product used
Possible alternatives
Zitrec
Pekasol L
LEU Energie
Prokühlsol
GmbH & Co. KG
GmbH
Propane-1,2-
Propane-1,2-
diol
diol
None
Light yellow
96%
-
1.051 g/ml
1.050 g/cm
164 °C
185 °C
9.9
7.5 - 9.5
Max. 5%.
-
None
None
None
None
None
None
None
None
1
1
Yes
-
Yes
-
Yes
-
-
-
Propylene glycol
Fauth & Co. KG
Propane-1,2-diol
None
98%
3
1.051 g/ml
188 °C
-
0,20%
None
None
None
None
1
-
-
-
For medical use
Maintenance
Glycol Overview

Maintenance intervals

Before initial start-up or after
a longer period of storage
Monthly
Every six months
7-3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMU FA+HC20.1 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Wilo-emu fa seriesFkt49 seriesTmpfkt49

Table of Contents