List of machine operators and maintenance
Maintenance and inspec-
tion log
A-2
Every person is required to enter all maintenance and alteration work which then is to be confirmed
with the person's own signature and that of their supervisor.
This list is to be shown on request to representatives of controlling organizations, government
inspection teams and the manufacturer!
Maintenance /
Revision on
Table A-2: Maintenance and inspection log
Date
Signature
Signature of the
person in charge
WILO EMU 3.0
Need help?
Do you have a question about the EMU FA+HC20.1 Series and is the answer not in the manual?
Questions and answers