Download Print this page

Aerial FreeRide Installation Manual page 13

Advertisement

Upper Arm to side Rail
1. Please see diagram above to determine the upper arms.
2. They should bolt together very easily
3. Leave them one turn from being tight
4. This will help slide into the H-section #25
H-Section (#25)
1. Be sure to check the H-section for any burr or defects prior to inserting the upper arms Aerial is
not liable for burr's
2. The clear Milar should be wrapped around the tube before you insert it into the H-section, once
your tower has been installed you will remove it. The Milar is there to help prevent any scratch's
from sliding the tubes in and out.
3. You will just tuck the wire for the tower light into the tube for the time being.
4. When you get to the wiring step you will remove one of the upper arm and run the wire through
it.

Advertisement

loading