Preparing the Machine

No Parts Required
Procedure
1. Ensure the reel drive engagement lever is in the
-
O
position; refer to the Operator's
REEL
DRIVE
FF
Manual.
2. Move the machine to a level surface and set the traction
drive engagement lever to the
N
position; refer to the Operator's Manual.
EUTRAL
3. Set the throttle control to the S
the on-off switch to the O
Operator's Manual.
4. Remove the spark-plug wire from the terminal of the
spark plug
(Figure
1).
1. Spark-plug wire
-
TRACTION
DRIVE
position and set
LOW
position; refer to the
FF
Figure 1
2
Installing the Light Bar to the
Machine
Parts needed for this procedure:
1
Right light-bar strap
4
Spacer
4
Flange-head bolt (3/8 x 1-1/4 inches)
1
Left light-bar strap
2
Flange-head bolt (5/16 x 1 inch)
2
Washer (5/16 inch)
2
Flange locknut (5/16 inch)
1
Spring post (1-3/4 inches)
1
Screw (5/16 x 2-3/4 inches)
Installing the Light Bar Straps to the
Machine
Note: Have another person help support the handle bar
while you install the light bar to the machine.
1. With the kickstand up, remove the locknut, washer,
spacer, and screw (5/16 x 1 inch) securing each side of
the kickstand to the side plates (A of
Note: Retain the locknuts, washers, spacers, and
screws (5/16 x 1 inch) for installation in step 13.
2. Remove the spring from the spring post (1 inch) of the
kickstand (B of
Figure
Note: Allow the kickstand to rotate to the ground.
2
Figure
2).
2).