Download Print this page
Bogen  WBS8T725  WBS8T725 WBS8T725 Specifications

Bogen WBS8T725 WBS8T725 WBS8T725 Specifications

Wall baffle wooden speaker assemblies

Advertisement

Quick Links

Wall Baffle Wooden
Speaker Assemblies
WBS8T725 & variations,
Bogen Wall Baffle Speakers consist of 8" cone speakers (S86 or S810) pre-assembled into a simulated wal-
nut-finished wooden enclosure with a black grille cloth on front.These wall baffles are handsomely styled
Description
and ruggedly built with 3/8" particle board reinforced at the corners. Designed for wall mounting, the face
is angled downward 13.5 degrees. Available options include recessed volume control and terminal strip.
• 4-watt capacity
• 6 power taps available (4, 2, 1, 1/2, 1/4, 1/8 watts)
Features
• Works with both 70V and 25V amplifier outputs
• Simulated walnut finish
• Pre-assembled for faster installation
• 8" cone speaker for excellent audio quality
Technical
Specifications
Model
WBS8T725
WBS8T725V
WBS8T725BR
4, 2, 1, 1/2, 1/4, 1/8
WBS8T725BRV
WBS810T725
Specifications subject to change without notice.
© 2008 Bogen Communications, Inc.
54-7777-09A 0808
Models
WBS810T725
50 Hz-
12 kHz
@25V & 70V
70 Hz-
15 kHz
• 6 oz. or 10 oz. magnet weights
• Recessed volume control available (V models only)
• Screw terminals available (BR models only)
• Easy wall-mount installation
• Mounting hardware included
95
6 oz.
dBspl
96
10 oz.
dBspl
WBS8T725
18 lb. /
carton
19 lb. /
carton
20 lb. /
carton
9-1/2" W x
9-1/2" H x
5-1/4" D
(3-1/4" D
@ bottom)

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bogen WBS8T725 WBS8T725 WBS8T725 and is the answer not in the manual?

Questions and answers

Summary of Contents for Bogen Bogen WBS8T725 WBS8T725 WBS8T725

  • Page 1 Speaker Assemblies WBS8T725 & variations, WBS810T725 Bogen Wall Baffle Speakers consist of 8" cone speakers (S86 or S810) pre-assembled into a simulated wal- nut-finished wooden enclosure with a black grille cloth on front.These wall baffles are handsomely styled Description and ruggedly built with 3/8" particle board reinforced at the corners. Designed for wall mounting, the face is angled downward 13.5 degrees.
  • Page 2 A control shall also be includ- ed for adjusting the volume of the loudspeaker. WBS810T725 The surface mounting loudspeaker shall be a Bogen model WBS810T725, or equiva- lent, 8" cone-type loudspeaker having a frequency response of at least 70 Hz to 15 kHz. Axial sensitiv- ity shall be 96 dB, measured at 1-watt/4-feet.

This manual is also suitable for:

Wbs8t725vWbs8t725brWbs8t725brvWbs810t725