Connecting To The Svp - Hitachi G200 Technical Reference

Service processor reference, virtual storage platform
Hide thumbs Also See for G200:
Table of Contents

Advertisement

Procedure
1.
2.
3.

Connecting to the SVP

The rear panel of the SVP has four RJ-45 ports. Using Category 5 or better
Ethernet cables, perform the following connections on the SVP. Your
management console must be able to access the SVP.
28
Hitachi Virtual Storage Platform G200, G400, G600 Service Processor Technical Reference
Align chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on
both sides.
If necessary, press the locking tabs when inserting.
When the server is pushed completely into the rack, the locking tabs
"click" into the locked position.
Optional: Insert and tighten the thumbscrews that hold the front of the
server to the rack.
Installing the SVP

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G400G600

Table of Contents