Below Grade Installation - Vermont Castings 33XDV Installation Instructions And Homeowner's Manual

Direct vent models
Hide thumbs Also See for 33XDV:
Table of Contents

Advertisement

XDV Direct Vent Gas Fireplace
Below Grade Installations
When it is not possible to meet the required vent ter-
minal clearances of 12" (305 mm) above grade level
a snorkel kit is recommended. This allows installation
depth of down to 7" (178 mm) below grade level. The
7" is measured from the center of the horizontal vent
pipe as it penetrates through the wall.
Ensure the sidewall venting clearances are observed.
If venting system is installed below ground, we recom-
mend a window well with adequate and proper drainage
to be installed around the termination.
If installing a snorkel, a minimum 24" (610 mm) vertical
rise is necessary. The maximum horizontal run with the
24" vertical pipe is 36" (914 mm). This measurement
is taken from the collar of the fireplace (or transition
elbow) to the face of the exterior wall. See the Sidewall
Venting Graph for extended horizontal run if the vertical
exceeds 24" (610 mm).
1. Establish vent hole through the wall. (Fig. 33)
2. Remove soil to a depth of approximately 16"
(406 mm) below base of snorkel. Install window
well (not supplied). Refill hole with 12" (305 mm) of
coarse gravel leaving a clearance of approximately
4" (102 mm) below snorkel. (Fig. 39)
3. Install vent system. See Page 18, Steps 2 through 5.
4. Ensure a watertight seal is made around the vent
pipe coming through the wall.
5. Apply high temperature sealant caulking (supplied)
around the 4" and 7" snorkel collars.
6. Slide the snorkel into the vent pipe and secure to the
wall.
7. Level the soil to maintain a 4" (102 mm) clearance
below snorkel. (Fig. 39)
Zero Clearance Sleeve
(if required)
Firestop
7" Pipe
24" (610 mm )
Minimum *
Fig. 39 Below grade installation.
BG402a
20
Top Vent

Below grade installation

1/26/00 djt
Screws
7TDVSNORK
(Snorkel)
4" Clear-
ance Min.
Window
Well
Gravel
Drain
Foundation Wall
*A minimum of 24" (610 mm)
vertical pipe must be installed
when using the 7TDVSNORK.
BG402a
Do not backfill around snorkel.
A clearance of at lest 4" must be main-
tained between the snorkel and the soil.
If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel. Fas-
ten brackets to wall first, then secure to snorkel with self
drilling #8 x 1/2 sheet metal screws. It will be necessary
to extend vent pipes out as far as the protruding wall
face. (Fig. 40)
Foundation
Recess
Watertight Seal
Around Pipe
Fig. 40 Snorkel installation, recessed foundation.
BG401
Vertical Through-the-Roof Application
Snorkel
This gas fireplace has been approved for:
2/10/99 djt
Vertical installations up to 40' (12 m) in height. Up
to a 10' (3 m) horizontal vent run can be installed
within the vent system using a maximum of two 90°
elbows. (Fig. 41)
Up to two 45° elbows may be used within the hori-
zontal run. For each 45° elbow used on the horizon-
tal plane, the maximum horizontal length must be
reduced by 18" (450 mm).
Example: Maximum horizontal length:
No elbows
= 10' (3 m)
1 x 45° elbow
= 8.5' (2.6 m)
2 x 45° elbows = 7' (2.1 m)
A minimum of an 8' (2.5m) vertical rise is required.
Two sets of 45° elbow offsets may be used within the
vertical sections. From 0 to a maximum of 8' (2.5 m)
of vent pipe can be used between elbows. (Fig. 42)
7DVCS supports offsets. (Fig. 44) This application
will require that you first determine the roof pitch
and use the appropriate starter kit. (Refer to Venting
Components List)
The maximum angular variation allowed in the sys-
tem is 270°. (Fig. 42)
The minimum height of the vent above the highest
point of penetration through the roof is 2' (610 mm).
(Fig. 45) Refer to note 2, Page 15.
Snorkel
Wall Screws
Sheet Metal
Screws
BG401
10009383

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36xdv39xdv

Table of Contents