Gooseneck Mount With Power Box Cx-Gsnk-G3 - FLIR Quasar CP-6302 Series Installation Manual

Gen iii
Hide thumbs Also See for Quasar CP-6302 Series:
Table of Contents

Advertisement

Installation
2.2.3

Gooseneck Mount with Power Box CX-GSNK-G3

Gooseneck mount (1.5 inch threaded) with IP68 power box.
Item
Gooseneck bracket and
power box
Accessory box
Quick install guide
Step 1
Fix backplate on mounting
surface.
Step 4
Attach pendant cap to gooseneck
pipe, complete cable connections,
and connect camera to pendant
cap.
Quasar CP-6302 Range Installation Manual - Ver. 3 - June 25, 2020
Details
Qty
CX-GSNK-G3 box 1
CX-GSNK-G3
1
gooseneck pipe
No. 2 Allen key
1
No. 3 Allen key
1
No. 5 Allen key
1
No. 6 Allen key
1
M4x8 hex cap
2
double washer
Summarized below 1
Step 2
Assemble power box and tighten
screws with No. 6 Allen key.
Step 5
Rotate gooseneck pipe to the
position required. Tighten
hexagon nuts to the flange and
use No. 3 Allen key to tighten
M4x8 hex socket screws.
This document does not contain any export-controlled information.
Step 3
Assemble gooseneck pipe on
backplate and power box.
Step 6
Use No. 6 Allen key to fix cover
screws.
9

Advertisement

Table of Contents
loading

Table of Contents