We have attempted to make your installation of the Accel CS boiler easy by pre-piping and pre-wiring a
complete system.
Note: These instructions are for quick reference only.
For complete instructions, refer to "Owner and Installation Manual" found inside top front cover.
3x2 Adaptor
for 2" venting
Insert into 3"PPS
adaptor. DO NOT
INSERT DIRECTLY
INTO STAINLESS
CONNECTION
Stainless steel vent
w/ built in test port
Gas: Right termination
Energy Kinetics Inc. 51 Molasses Hill Rd. Lebanon, NJ 08833 800-323-2066
Install Air Vent & Relief Valve
Remove hygroscopic air vent cap
when purging the system, and hand
tighten when placing into service.
3" Appliance adaptor
Use for all PPs
venting.
2"/3" Direct Air Inlet
See diagram pg 2 fig A
Gas, Return and Drain Piping
Return: Left termination
Use included 1" x 18" Nipple
Gas: Rear termination
X:\TechDocs\Installation_Manuals\AccelCS_Quick_Install_Guide\AccelCS Quick Install Guide 02-26-19.doc
Accel CS
Installation Guide
Install Circulator to supply
flange. Bolts, gaskets and
flange located in component
box.
Return: Right termination
Use included 1" x 9" nipple
Condensate Trap: Fill with water prior to
startup. Make sure trap ball floats freely
before completing install.
™
Premier System: Install ½"
nipple, & Combo Boiler
Feed/Backflow Preventer
www.energykinetics.com
Need help?
Do you have a question about the Accel CS and is the answer not in the manual?
Questions and answers