Alcatel OneTouch Go Play Repair Document page 62

Table of Contents

Advertisement

TCL
L2 Repair Document
Communication Ltd.
After TP/LCD module is assembled and pressed, please keep put the handset in below anti-
static blister box and let it stand for about 4 hours before going to next step
Step8. Air leak test for Full-Product:
There are two solutions for full-product air leak test. If the phone can power on, you can
use APK test; if can't power on, can only use air leak position test jig
(PN: WAA61H0R3001)
Solution1: APK test
Prepare
I.
Materials and tools prepare
Rev.
Page
1.3
62/95
Go Play 7048X_A Level 2 Repair Document
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7048x7048a

Table of Contents