TCL
L2 Repair Document
Communication Ltd.
the TP/LCD module to the frame.
Tear off release film
Connect TP/LCD FPC to Main board BTB connector, and fix the lcm-con-support steel with
screws;
lcm-con-support
After assembling the TP/LCD module, please use the jig to press TP/LCD module.
Pressure parameter: 0.7MPa; Time: 20s;
Rev.
Page
1.3
61/95
Go Play 7048X_A Level 2 Repair Document
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.