Filling And Purging The Heating Installation - Vaillant VWL Series Operating Instructions Manual

Hydraulic station
Table of Contents

Advertisement

8 Start-up
Caution.
Risk of material damage if the heating
water is treated with unsuitable additives.
Unsuitable additives may cause changes in
the components, noises in heating mode and
possibly subsequent damage.
Do not use any unsuitable antifreeze and
corrosion inhibitors, biocides or sealants.
No incompatibility with our products has been detected to
date with proper use of the following additives.
When using additives, follow the manufacturer's instruc-
tions without exception.
We accept no liability for the compatibility of any additive or
its effectiveness in the rest of the heating system.
Additives for cleaning measures (subsequent
flushing required)
Adey MC3+
Adey MC5
Fernox F3
Sentinel X 300
Sentinel X 400
Additives intended to remain permanently in the
installation
Adey MC1+
Fernox F1
Fernox F2
Sentinel X 100
Sentinel X 200
Additives for frost protection intended to remain
permanently in the installation
Adey MC ZERO
Fernox Antifreeze Alphi 11
Sentinel X 500
If you have used the above-mentioned additives, inform
the end user about the measures that are required.
Inform the end user about the measures required for frost
protection.
8.3

Filling and purging the heating installation

1.
Flush the heating installation thoroughly prior to filling.
2.
Open all of the thermostatic valves on the heating in-
stallation and, if required, all other isolation valves.
3.
If no domestic hot water cylinder is connected, seal the
product's cylinder flow and cylinder return connection
with on-site plugs.
4.
Check all of the connections and the entire heating in-
stallation for leaks.
5.
Switch the prioritising diverter valve to manual operation
(→ Page 33) and turn the selection lever to "Heating
circuit/domestic hot water cylinder".
Both valves are open and the filling procedure is
improved since the air in the system can escape.
The heating circuit and the spiral immersion heater
for the domestic hot water cylinder are filled at the
same time.
34
6.
Connect a filling hose to the filling device (1).
7.
To do this, unscrew the screw cap from the filling device
and secure the free end of the filling hose to here.
1
2
8.
Open the purging screw (2) on the automatic air vent
(1) in order to purge the product.
9.
Open the filling device.
10. Open the heating water supply slowly.
11. Purge the highest radiator or underfloor heating circuit
and wait until the circuit is completely purged.
The water must escape from the purging valve
without bubbles.
12. Fill with water until the manometer (on-site) shows that
the heating installation has reached a pressure of ap-
prox. 1.5 bar.
Note
If you fill the heating circuit at an external
location, you must install an additional mano-
meter to check the pressure in the installa-
tion.
13. Close the filling device.
14. Then check the heating installation pressure again (if
required, repeat the filling procedure).
15. Remove the filling hose from the filling device and
screw the screw cap back on.
16. Set automatic mode for the prioritising diverter valve
again (→ Page 33).
When the product starts up, the diverter valve auto-
matically moves to the "Heating circuit" outlet posi-
tion.
Installation and maintenance instructions Hydraulic Station 0020291544_01
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents