Install two disconnectors for the product, as shown in
the figure.
3.
Use a 5-pole power supply cable (from the heat pump
electricity meter) and a 3-pole power supply cable (from
the household electricity meter). Route this from the
building and through the wall duct to the product.
4.
Connect the 5-pole power supply cable to connection
X200 in the electronics box.
5.
Remove the 2-pole bridge from the X210 connection.
6.
Connect the 3-pole power supply cable to connection
X211.
7.
Use the strain relief clamps to secure the power supply
cables in place.
7.10

Connecting the eBUS line

1.
Use a 2-pole eBUS line with a conductor cross-section
of at least 0.75 mm². Route this from the building and
through the wall duct to the product.
6
S20
5
4
X206
S21
3
2
BUS
1
2.
Connect the eBUS line to connection X206, BUS.
3.
Use the strain relief clamp to secure the eBUS line in
place.
7.11

Connecting a limit thermostat

1.
Use a 2-pole line with a conductor cross-section of
at least 0.75 mm². Route this from the building and
through the wall duct to the product.
6
S20
5
4
X206
S21
3
2
BUS
1
2.
Remove the bridge from the X206, S20 connection.
Connect the line here.
3.
Use the strain relief clamp to secure the line in place.
0020297937_01 aroTHERM plus Installation and maintenance instructions
7.12
Observe the wiring diagram in the appendix.
N
7.13
L3
1.
Note that the cover contains a safety-relevant seal
L2
which must be effective in the case of a leak in the
L1
refrigerant circuit.
2.
Secure the cover by lowering it into the locking mechan-
L
ism without damaging the circumferential seal.
N
3.
Use two screws to secure the cover to the lower edge.
8

Start-up

8.1
Check whether all the hydraulic connections are estab-
lished correctly.
Check whether all the electrical connections are estab-
lished correctly.
Check, depending on the type of connection, whether
one or two disconnectors are installed.
If it is stipulated for the installation site, check whether a
residual-current circuit breaker has been installed.
Read through the operating instructions.
After installation, ensure that at least 30 minutes have
passed before switching on the product.
Ensure that the cover for the electrical connections is
installed.
8.2
Switch on all of the disconnectors to which the product is
connected in the building.
8.3
-
eBUS
+
Before filling or topping up the installation, check the
quality of the heating water.
Checking the quality of the heating water
Remove a little water from the heating circuit.
Check the appearance of the heating water.
If you ascertain that it contains sedimentary materials,
you must desludge the installation.
Use a magnetic rod to check whether it contains mag-
netite (iron oxide).
If you ascertain that it contains magnetite, clean the in-
stallation and apply suitable corrosion-inhibition meas-
ures, or fit a magnetic filter.
Check the pH value of the removed water at 25 °C.
If the value is below 8.2 or above 10.0, clean the installa-
tion and treat the heating water.
Ensure that oxygen cannot get into the heating water.

Connecting accessories

Installing the cover for the electrical

connections

Checking before switching on

Switching on the product

Checking and treating the heating
water/filling and supplementary water
Caution.
Risk of material damage due to poor-qual-
ity heating water
Ensure that the heating water is of suffi-
cient quality.
Start-up 8
125

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vwl 45/6 a 230v s3Vwl 155/6 a s3Vwl 55/6 a 230v s3Vwl 65/6 a 230v s3Vwl 85/6 a 230v s3Vwl 125/6 a 230v s3 ... Show all

Table of Contents