Installation; Installation & Start-Up Overview; Pre-Installation Checklist - Welbilt Multiplex FreshBlender Service Manual

Integrated beverage systems
Hide thumbs Also See for Multiplex FreshBlender:
Table of Contents

Advertisement

Installation & Start-up Overview
These instructions are provided as an overview to assist the
qualified installer. Contact your Welbilt Service Agent or call
Welbilt for information regarding start-up services.

IIportant
Failure to follow these installation guidelines may affect
warranty coverage.
NOTE: Full installation instructions are included in each unit
in the Installation, Operation, & Maintenance manual.
Part Number REV00 04/08/2020
Section 2

Installation

PRE-INSTALLATION CHECKLIST

Keep product bags thawing in a cooler at least 24
hours prior to installation.
Any damage should be noted and reported to the
delivering carrier immediately.
Check the lower portion of the unit to be sure
casters are not bent.
Visually inspect the refrigeration package,
compressor compartment housing. Be sure lines
are secure and base is still intact.
Inspect installation location behind the unit for
electrical outlet location, water hose fittings, and
shutoff.
Check voltage at outlet dedicated for the Fresh
Blends unit.
Verify floor of install location is level front to back,
side to side and all casters are touching the floor.
The mass of this appliance will allow it to move
uncontrolled on an inclined surface. Adequate means
must be provided to prevent uncontrolled movement
at all times.
Remove the side panels from the unit to make the
board connections, and water regulator gauge
accessible.
Check that board connections are secure and did
not vibrate loose during shipment.
Check that the micro switch is in line with the
motor above the blender.
Warning
n
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fb081tf

Table of Contents