Fronius Primo Series Operating Instructions Manual page 24

Inverter for grid-connected photovoltaic systems
Table of Contents

Advertisement

Earnings
amount of money earned during the monitored period (currency can be selected in the
Setup menu)
As was the case for the output energy, readings may differ from those of other instru-
ments.
"The Setup Menu" section describes how to set the currency and rate for the energy sup-
plied.
The factory setting depends on the respective country-specific setup.
CO2 savings (g / kg)
CO
The value for CO
CO
factory setting is 0.53 kg / kWh (source: DGS – Deutsche Gesellschaft für Sonnenenergie
e.V. (German Society for Solar Energy).
AC Max. Voltage L-N (V)
highest reading of voltage between the conductor and neutral conductor during monitored
period
PV Array Max. Voltage (V)
highest reading of solar module voltage during monitored period
Operating Hours
indicates how long the inverter has been operating (HH:MM)
IMPORTANT! The time must be set correctly for day and year values to be displayed
properly.
22
emissions saved during the period in question
2
savings depends on the power station facilities and corresponds to the
2
emissions that would be released when generating the same amount of energy. The
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents