Download Print this page

Huawei OptiX PTN Series Quick Installation Manual page 11

Packet transport platform
Hide thumbs Also See for OptiX PTN Series:

Advertisement

Installing Boards and Components
1 Installing Boards
a
Installing PIU/PSU boards
DANGER
Before removing a PIU board, disconnect the corresponding PDU circuit
breaker, pull the nameplate, and remove the PIU input cable to prevent
bodily injuries.
• Wear an ESD wrist strap or ESD gloves during operations.
• The board is designed for easy installation. If you feel a blockage when
inserting a board into a slot, remove the board and check whether it was
inserted correctly or whether it is of the correct type. Do not use force to
insert the board.
PIU/PSU slots
Board
Slot
PIU
Slot31, Slot32, Slot37, Slot38
Slot33, Slot34, Slot35,
PSU
Slot36 (preserved, currently with a filler panel)
OptiX PTN 7900-24 PIU/PSU board
installation area
Installing a PIU board:
Pull the nameplate. Push the PIU board with
proper force until it is fully seated in the slot.
PIU installation area
PSU installation area
Installing a PSU board:
Push the PSU board with proper force
until it is fully seated in the slot.
PSU installation area
PIU installation area
PIUs/PSUs are inserted differently in the upper and lower portions of a
subrack. When the PIU or PSU is installed in the upper power supply area,
the handle faces downwards. When a PIU or a PSU is installed in a lower
power supply area, the handle faces upwards.
Handle facing downwards
8
Handle facing upwards
Tighten the screws after inserting the PIU
into the slot. Recovery the nameplate.
M3 captive screw:
5.5±10% kgf· cm
Tighten the screws after inserting the PSU
into the slot.
M3 captive screw:
5.5±10% kgf· cm

Advertisement

loading

This manual is also suitable for:

Optix ptn 7900-24Ptn seriesOptix ptn 7900-12