Huawei OptiX PTN Series Quick Installation Manual page 3

Packet transport platform
Hide thumbs Also See for OptiX PTN Series:

Advertisement

Installation Flow
Reference information
Operation
Installing Boards
Installing Fan
powered box
Cable Holes on
Cabinets
Installing/Routing
Ground and Power
Cables
Installing/Routing
NM Cables
Installing/Routing
Housekeeping
Alarm Cables
Installing/Routing
Cabinet Indicator
Alarm Cables
Installing/Routing
Network Cables
(GE Electrical
Module Scenario)
Installing/Routing
E1 Cables
If boards have been installed on a PTN 7900-24 before delivery, do not remove any board or module (such as the fan
module) during transportation. To learn how to replace boards and modules after an installation is complete, see the
chapters "Installing the Subrack" and "Installing Boards and Components ".
NOTE
When the delivered subrack has been equipped with boards in cabinet, you can skip the steps involving "Installing
Subrack" and "Installing Boards and Components".
Start
Preparing for
Installation
the Installation
Precautions
Requirements and
Precautions for
Operating Boards
Required Tools and
Equipment
OptiX PTN 7900-12
Appearance
Installing a Subrack
Installing Boards
and Components
Installing/Routing
Cables
Installing/Routing
Fibers
Installing Cabinet
Doors
Performing the
Post-installation
Check
Provisioning Optical
Paths
Engineering Labels
End
Open-End
Corrugated Pipe
Introduction
Precautions
Installing/Routing
External Fibers

Advertisement

loading

This manual is also suitable for:

Optix ptn 7900-24Ptn seriesOptix ptn 7900-12