6-Prepare Power Supply; Electrical Specifications; 7-Level The Unit; Leveling Information - U-Line 2175BEVOL2 Installation Manual

Echelon series beverage center beverage center with overlay
Hide thumbs Also See for 2175BEVOL2:
Table of Contents

Advertisement

6 Prepare Power Supply

Electrical Specifications

CAUTION
Electrical installation must observe all state and local
codes. This unit requires connection to a grounded (three-
prong), polarized receptacle that has been placed by a
qualified electrician.
The unit requires a grounded and polarized 115 VAC,
60 Hz, 15A power supply (normal household current).
An individual, properly grounded branch circuit or circuit
breaker is recommended. GFCI (ground fault circuit
interrupter) is usually not required for fixed location
appliances and is not recommended for your unit because
a GFCI could be prone to nuisance tripping. However, be
sure to consult your local codes.
See Figure 24 for recommended receptacle location.
1-1/2"
Figure 24
WARNING
SHOCK HAZARD — Electrical Grounding Required.
• Never remove the round grounding prong from
the plug and never use a two-prong grounding
adapter.
• Never use an extension cord to connect power to
the unit.
Go on to 7 Level the Unit.
7 Level the Unit

Leveling Information

Note: It is recommended that the unit is level.
1. Use a level to check the levelness of the Beverage
Center from front to back and from side to side. Level
www.U-LineService.com
2175BEVS/2175BEVOL2 Beverage Center
23-1/4"
7"
should be placed along top edge and side edge as
shown (see Figure 25).
Figure 25
2. If the Beverage Center
the corners of the unit as necessary (see Figure 26).
Figure 26
3. Check the levelness after each adjustment and repeat
the previous steps until the unit is level. Go on to
8 Install the Unit.

Installation Tip

If the room floor is higher than the floor in the cut-out
opening, adjust the rear feet to achieve a total unit rear
height of 1/8" less than the opening's rear height. Shorten
the unit height in the front by adjusting the front feet.
This allows the unit to be gently tipped into the opening.
Readjust the front feet to level the unit after it is correctly
positioned in the opening.
8 Install the Unit

ANTI-TIP BRACKET INSTALLATION

1. Locate the two Anti-Tip brackets included inside the
unit.
14
1
ULIN_0833_A
®
is not level, adjust the feet on
Turn Foot to Adjust
03/2008

Advertisement

Table of Contents
loading

This manual is also suitable for:

2175bevs

Table of Contents