Huawei UPS5000-S-1600KVA-FP Quick Manual page 5

Hide thumbs Also See for UPS5000-S-1600KVA-FP:
Table of Contents

Advertisement

2. Install the U-shaped sealing plate component (numbered 01).
3. Install busbar components (numbered 02 and 03).
Busbar component (numbered 02)
4. Use copper bars (numbered 04–06) to connect the busbar components (numbered 02 and 03).
Before installation, remove the screws that are partially tightened from the busbar component.
The two insulators do not need
to be secured with screws.
Busbar Component (numbered 03)
5

Advertisement

Table of Contents
loading

Table of Contents