Download Print this page

Section 2: Survey And Demo; Section 3: Installation - Fireco Dorgard Pro Handbook

Hide thumbs Also See for Dorgard Pro:

Advertisement

Surveying a
building prior to
installation
2. Binding
Dorgard Pro Depress the plunger on your
Demo Dorgard Pro. This will bind the two units
and enable you to survey a building.
Freedor Pro Push the button on the front of
unit. This will bind the two units together and
enable you to survey a building.
!
1. Activate survey mode
Switch the Pro Demo & Site Survey Transmitter into
survey mode by flicking the switch on the base of
the Survey Transmitter to the right.
Dorgard Pro
!
3. Surveying
Place the Survey Transmitter where you are proposing
to install the Fireco Transmitter. This should be within 2
metres of the fire alarm relay. Do not site Transmitters
within 1 metre of power sources or metal surfaces
(including Georgian wire glass).
Survey and
demo
Scan to watch our
technical support video
Page 7

Hide quick links:

Advertisement

loading

Related Products for Fireco Dorgard Pro