Overland Storage SnapServer XSR 40 Instructions

Overland Storage SnapServer XSR 40 Instructions

Add-on/spare pcie card
Hide thumbs Also See for SnapServer XSR 40:

Advertisement

Quick Links

Add-on/Spare PCIe Card Instructions
This document describes how to remove and replace a PCIe
card in a SnapServer XSR40 from Overland-Tandberg.
WARNING:
To reduce the risk of electric shock or damage to
equipment, always remove any power cords while working with
the unit.
WARNUNG:
Um das Risiko eines elektrischen Schlags oder
Schäden am Gerät zu vermeiden, ziehen Sie stets den
Netzstecker, bevor Sie an der Einheit arbeiten.
AVERTISSEMENT:
Pour réduire le risque de choc électrique
ou endommagement de l'équipement, retirez toujours les
cordons électriques en travaillant avec l'appareil.
CAUTION:
While working with the unit, observe standard
Electrostatic Discharge (ESD) precautions to prevent damage
to micro-circuitry or static-sensitive devices.

Prepare the Unit

It is essential that you activate your warranty. Technical and
warranty support is not available until you are registered.
For an existing customer:
1. Go to
http://support.overlandstorage.com/
2. Enter your e-mail address and password, and press
Enter or click the right arrow (>).
3. Click Register New Product.
4. Fill in the information (including serial number) and
click Submit.
Your warranty certificate will be emailed to you. Follow
the instructions in the email to complete the process.
For an existing customer, go to
the instructions.

Power Off and Disconnect

If the unit is still running, power it down cleanly:
1. Use the Web Management Interface to shut down the
server (Maintenance > Reboot and Shutdown >
Shutdown).
2. When all the LEDs are off, disconnect the power cords.
3. Disconnect the remaining cables from the unit.
10400560-002 11/2017
support page.
Register a Product
and follow
©2014-17 Overland Storage
NOTE: The Spare may come without the mounting bracket.
Reuse the existing bracket.
Existing Customer Login
Enter
New Customer Registration
SnapServer
XSR40
®
Enter
Enter
All Fields
Page 1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SnapServer XSR 40 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Overland Storage SnapServer XSR 40

  • Page 1 1. Use the Web Management Interface to shut down the server (Maintenance > Reboot and Shutdown > Shutdown). 2. When all the LEDs are off, disconnect the power cords. 3. Disconnect the remaining cables from the unit.  Page 1 of 4 10400560-002 11/2017 ©2014-17 Overland Storage...
  • Page 2 • Sliding rails: With a lifter positioned in front of the array, release the screws, release the rail locks, and slide the chassis out onto the lifter. 2. Move the chassis onto a secure surface. Page 2 of 4 10400560-002 11/2017 ©2014-17 Overland Storage ...
  • Page 3 (1.25cm) extending out over the rear of the unit. 2 Screws 2. Slide the panel forward until it is fully seated. On Back 3. Using the two captive screws on the rear of the top panel, secure it. Page 3 of 4 10400560-002 11/2017 ©2014-17 Overland Storage ...
  • Page 4 2. Use the existing packing materials to secure them in the box. 3. Use an RMA to return the parts to Overland-Tandberg. For return shipping details and RMA number, go to: http://docs.overlandstorage.com/return-instructions Page 4 of 4 10400560-002 11/2017 ©2014-17 Overland Storage ...

Table of Contents