Connecting The Power Cord; Switching On The Multi-Node Server System For The First Time - Fujitsu PRIMERGY CX400 M4 Operating Manual

Server enclosure
Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Information for ensuring electromagnetic compatibility
All data and signal cables must have sufficient shielding. The use of cable type
S/FTP Cat5 or higher is recommended.
Use of unshielded or badly shielded cables may lead to increased emission of
interference and/or reduced fault-tolerance of the device.
5.4.2

Connecting the power cord

The system has two bays for hot-plug PSUs. Each hot-plug PSU can be
replaced during operation (see the "FUJITSU Server PRIMERGY CX400 M4
Server Enclosure Upgrade and Maintenance Manual").
V
CAUTION!
The server enclosure is automatically set to a mains voltage in the range
100 - 240 V. You may only operate the server enclosure if its rated
voltage range corresponds to the local mains voltage.
Ê Connect the power cord to the PSU.
Ê Connect the mains connector to an outlet on the socket strip of the rack.
I
It will take about 60 seconds until the server can be switched on.
I
For more information, see the technical manual for the rack.
5.5
Switching on the multi-node server system
for the first time
The multi-node server system consists of up to four server nodes. Each server
node installed in the server enclosure works independently.
To switch on the multi-node server system the power cord must be connected
to the mains and each server node must be switched on separately.
I
The controls and indicators are shown in
CX400 M4
Operating Manual
figure 5 on page
21.
Starting up
61