In this way you will benefit from all the design features and enjoy safe use of the product. Thank you for choosing Hills. Warning • Do not allow children or pets to swing on your Clothesline or items of laundry.
Pack Contents Unpacking the Supa Fold ® Folding Frame Post Kit 1. Open the front face of the carton (all carton materials can be recycled). 2. Check all components are in the carton (refer to tables below for your model). Supa Fold Post Kit Standard - Fixed Supa...
Installation Select a suitable location 1. Assemble Cross Brace The Cross Brace is pre-assembled in 1. Select a suitable location for your Post these models; mounted Supa Fold Clothesline. ® • Supa Fold Post Kit Standard - Fixed 2. Ensure you have left sufficient space ®...
Page 5
Installation Installing the Post Kit ‘Post Hole Centres’ You will require the following materials Centres Product (mm) and tools: Supa Fold 230 Advantage 2200 ® Pre-Mix Concrete Supa Fold 230 2200 Coarse Gravel ® Spade Supa Fold 210 2200 ® Tape Measure Supa Fold 190...
Page 6
Installation Installing Fixed Posts directly into the ground A. Having selected a suitable location, dig two holes approximately 200mm diameter x 600mm deep at hole centres to suit your product (see Post Hole Centre Chart on pg. 5). Place approximately 150mm of coarse gravel into the hole.
Page 7
Your Posts can be installed using Ground Sleeves, which allow future removal of the Posts if required. Ground Sleeves are available from Hills as optional accessories. A. Having selected a suitable location, dig two holes approximately 200mm diameter x 600mm deep at hole centres to suit your product (see Post Hole Centre Chart on pg.
Page 8
Installation Installing Adjustable Posts Directly into the ground A. Having selected a suitable location, dig two holes approximately 200mm diameter x 600mm deep at hole centres to suit your product (see Post Hole Centre Chart on pg. 5). Place approximately 150mm of coarse gravel into the hole.
Page 9
Your Posts can be installed using Ground Sockets, which allow future removal of the Posts if required. Ground Sockets are available from Hills as optional accessories. A. Having selected a suitable location, dig two holes approximately 200mm diameter x 600mm deep at hole centres to suit your product (see Post Hole Centre Chart on pg.
Operation Operating your Adjustable Fig. 5 Post Kit • Your Adjustable Post Kit has five height settings (Fig.4) • To adjust, depress the Locking Button and slide the upper Post up or down (Fig.5) • The spring loaded Locking Button will re-engage at the next height location.
Page 11
Hills specific approval or is operate correctly due to faulty workmanship sold as a Hills product the warranty on this or defective material, it will repair or replace product is waived. The product is designed the part free of cost for a period of TEN (10) to perform a specific task under established...
Need help?
Do you have a question about the Supa Fold Post Kit Standard - Adjustable Series and is the answer not in the manual?
Questions and answers