Per Western Digital Terms and Conditions of Sale, the user of Western Digital products in life support applications assumes all risk of such use and indemnifies Western Digital against all damages.
Western Digital EU EcoDesign Disclosures This document provides information and instructions related to the Ultrastar Serv60+8 's disclosures for the EU's ecodesign requirements. In This Chapter: - EcoDesign Overview........2 - Ultrastar Serv60+8 EcoDesign Specifications...........2 - Instant Secure Erase / Secure Erase.... 2...
Secure Erase (SE) features included with Western Digital drives. Data Erasure Options Western Digital provides several options for securely erasing data from its drives. The appropriate method depends upon many factors, including the following: • Erase Configuration (ISE or SE) •...
Page 6
/documents.westerndigital.com/content/dam/doc-library/en_us/assets/public/western-digital/ collateral/tech-brief/tech-brief-instant-secure-erase..ISE / SE Overview Instant Secure Erase (ISE) is Western Digital’s implementation of the industry standard T10 (SAS)/T13 (SATA) command, allowing users to instantly erase both user-accesible data and hidden user data from sanitize Western Digital drives.
Page 8
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Table 1: Procedure Requirements Time Required Tools # of People Required Required T7, T8, T10. T30 Torx Screwdrivers * 3 hours #1 Phillips Screwdriver Tweezers Step 1 : From the rear of the enclosure, detach the retention clip from the PSU cable and remove the cables from the PSUs.
Page 9
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 2: Open Baskets b. Remove one cable at a time from the arm, making sure not to put too much strain on the arm. Step 4 : Remove the CMA(s). a.
Page 10
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Step 5 : Uninstall the PSU. a. Grasp the release lever and the metal handle in a downward pinching motion to release the latching mechanism. Figure 4: Uninstalling PSU b. Pull the PSU straight out with even pressure. Step 6 : Uninstall the remaining PSU in the same manner as the first.
Page 11
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 6: Unlatch Drive Carrier (IOM Not Shown) c. Lift the Drive Assembly free from the enclosure. Figure 7: Removing Drive Assembly Step 10 : Follow the previous step for each drive in the enclosure. Store the drives in an ESD safe location. Step 11 : Uninstall the IOM.
Page 12
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly a. Locate the latch release on the IOM and press it in the direction shown in the following image. Figure 8: Unlatching the IOM b. Grasp both handles, one handle in each hand, and lift evenly with both hands to ensure the IOM comes out straight.
Page 13
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly a. Be prepared to support the enclosure once it is free of the rails by having a second person or a lift to support the enclosure b. Grasp both handles at the front of the enclosure and pull with even pressure until the enclosure will not extend further.
Page 14
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 11: Lift the Rear Fan Flap Figure 12: Unlatching Rear Fan b. Use the handle to pull evenly on the component to remove it from the enclosure.
Page 15
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 13: Removing Rear Fans Step 16 : Uninstall the rest of the system fans in the same manner as the first. Step 17 : Uninstall server cover panels. a. Remove the screws that secure the server cover panels to the chassis using a T7 Torx screwdriver.
Page 16
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly b. Remove the server cover panel by carefully pulling on the edge where the screws were removed. Figure 15: Removing the Server Cover Panel Step 18 : Uninstall the remaining server cover panel in the same manner as the first. Step 19 : Uninstall the fan bay.
Page 17
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 16: Rear DIMMs Location a. Remove the screw that secures the fan bay to the chassis. Figure 17: Removing the Fan Bay Screw b. Locate the pin that secures the outside of the fan bay to the chassis and pull the pin out and pull up on the fan bay until the you have access to the cable that connects the fan bay to the baseboard.
Page 18
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 18: Fan Bay Pin Figure 19: Removing the Fan Bay c. Remove the screws that secure the plenum in place and lift the plenum off of the chassis.
Page 19
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 20: Removing the Plenum Step 20 : Uninstall the remaining fan bay and plenum in the same manner as the first. Step 21 : Uninstall the System Fan Bay. a. Loosen the captive screws that secure the system fan bay to the chassis using a T15 Torx Screwdriver until the cover comes loose.
Page 20
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 21: Loosening the System Fan Bay Captive Screws b. Slide the system fan bay out of the chassis and set it aside.
Page 21
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 22: Removing the System Fan Bay Step 22 : Uninstall the DIMMs. a. Identify the location of the DIMM. b. Carefully push apart on the DIMM ejector tabs located on either side of the DIMM slots. The DIMM will pop up and unlock from the DIMM slot.
Page 22
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 23: DIMM Ejector Tabs c. Slide the DIMM out of the of DIMM slot and set it aside. Figure 24: DIMM Removal d. Uninstall the remaining DIMMs in the same manner as the first. Step 23 : Uninstall the System Fan base.
Page 23
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 25: Removing the System Fan Base (highlighted in red) b. Locate and remove the LED brackets that are attached to the Heat Sink. Figure 26: Uninstalling the CPU LED Brackets Step 24 : Uninstall the CPU and Heat Sink module.
Page 24
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 27: Heat Sink Removal Order c. Slide the Heat Sink clear of the socket alignment pins. Step 25 : Uninstall the remaining CPU and Heat Sink in the same manner as the first. Step 26 : Uninstall the M.2.
Page 25
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 28: M.2 Screw c. Pull the top M.2 out of the connector. Figure 29: Uninstalling the M.2s d. Repeat the previous substep to remove the bottom M.2. Step 27 : Uninstall the add-in card bracket. a.
Page 26
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 30: Add-In Card Screws b. Remove the bracket from the end of the chassis. Figure 31: Add-In Card Bracket...
Page 27
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 32: Add-In Card Bracket Removed Step 28 : Uninstall the add-in cards. a. Locate the first add-in card. b. Remove all cabling from the add-in card. Figure 33: Add-In Card Remove Cabling and Uninstall c.
Page 28
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 34: Rear Bulkhead Chassis Screws (Left Side) Figure 35: Rear Bulkhead Chassis Screws (Right Side) c. Remove the 5 T7 screws from the face of the rear bulkhead.
Page 29
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 36: Rear Bulkhead Face Screws d. Carefully remove the rear bulkhead from the chassis. Figure 37: Removing the Rear Bulkhead Step 31 : Uninstall the Lower Air horn bracket by rotating the top of the bracket away from the center channel and slide the bracket out.
Page 30
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 38: Uninstalling the Air Horn Step 32 : Uninstall the motherboard. a. Disconnect all of the cables that are connected to the motherboard. These cables connect to other various components within the chassis. These other connections can remain connected to other components until it is time to uninstall each of those components.
Page 31
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 39: Motherboard Screw Location c. Remove the motherboard from the chassis by sliding the motherboard toward the rear of the chassis and out.
Page 32
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 40: Removing the Motherboard Step 33 : Uninstall the ATX PDB. a. Disconnect all of the cables that are connected to the ATX PDB. b. Remove the 5 T7 screws from the ATX PDB.
Page 33
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 41: ATX PBD Screw Location c. Remove the ATX PDB from the chassis.
Page 34
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 42: Removing the ATX PBD Step 34 : Uninstall the IOM housing. a. Remove the 2 T7 screws from the top front of the IOM housing located at the front top of the chassis.
Page 35
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 44: Inner IOM Housing Screws (Left Side) Figure 45: Inner IOM Housing Screws (Right Side) c. Remove the 10 T7 screws (four on each side) from the inside of the drive cage that connect to the IOM housing.
Page 36
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 46: IOM Housing Screws (Inner IOM housing location) d. Lift the IOM housing out of the chassis. Figure 47: Removing the IOM Housing Step 35 : Disassemble the IOM housing.
Page 37
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly a. Remove the 17 T7 screws from the right IOM housing side panel and remove the panel. Figure 48: IOM Housing Screw Location (Right Panel) b. Remove the 11 T7 screws from the left IOM housing side panel and remove the panel. As a result, the SSD board will detach from the IOM housing.
Page 38
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 49: IOM Housing Screw Location (Left Panel) c. Remove the drive divider frame. Once the left side panel has been removed, the drive divider frame will be disconnected from everything. d.
Page 39
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 50: Removing the SSD Board from the Bottom Plate e. Disconnect all of the cables from the SSD board. Step 36 : Uninstall the lower bulkhead plate. a. Find the lower bulkhead plate located directly behind the drive cages. The lower bulkhead plate contains the connectors that get routed to the rear bulkhead connectors.
Page 40
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 51: Lower Bulkhead Plate Location b. Remove the Ethernet cable that is connected to the port at the rear of the baseboard. c. Remove the 4 T7 screws that secure the lower bulkhead plate to the chassis from either side of the chassis.
Page 41
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 52: Lower Bulkhead Plate Screw Location d. Slide plate toward the rear of the enclosure and rotate up and out.
Page 42
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 53: Removing the Lower Bulkhead Plate Step 37 : Uninstall the left drive cage. Note: The left drive cage is located on the left side when accessing the enclosure from the front. a.
Page 43
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 55: Left Drive Cage T8 Screw Location (Outside of the Chassis) b. Remove the 4 T7 from inside the drive cage in the first bay. Figure 56: Left Drive Cage Screw Location (Inside of the Chassis) c.
Page 44
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 57: PDB Baseboard Screw Location d. Remove the 4 T7 from inside the drive cage tabs located in each bay after the front bay.
Page 45
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 58: Left Drive Cage Screw Location (Connection to the base board) e. Firmly pull up on the frame of the drive cage and remove it from the chassis. Figure 59: Removing the Left Drive Cage Step 38 : Uninstall the right drive cage.
Page 46
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Note: The right drive cage is located on the right side when accessing the enclosure from the front. a. Remove the drive cage screws from the outside of the left-hand side of the chassis. There are 12 T7 screws and 2 T8 screws.
Page 47
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 62: Right Drive Cage Screw Location (Inside of the Chassis) c. Remove the 4 T7 from inside the drive cage tabs located in each bay after the front bay.
Page 48
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 63: Right Drive Cage Screw Location (Connection to the base board) d. Firmly pull up on the frame of the drive cage and remove it from the chassis.
Page 49
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 64: Removing the Right Drive Cage Step 39 : Uninstall the baseboard. a. Remove the 14 T7 screws that secure the T-board in place. Figure 65: T-board Screw Location b. Remove the 17 T7 screws that secure the baseboard in place.
Page 50
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Note: Only remove the Torx screws. Do not remove any of the Philips Head screws from the baseboard. Figure 66: Baseboard Screw Location c. Once all of the HDD limiters have been removed, pull up on the T-board near the front of the chassis and remove it.
Page 51
1. EU EcoDesign Disclosures EcoDesign Disclosures 1.4 Ultrastar Serv60+8 Disassembly Figure 67: Removing the T-board d. Pull up on the 60 baseboard and remove it from the chassis. Figure 68: Removing the 60 Baseboard e. Remove the Formex lining that protects the baseboard from the chassis. This lining is just set in place and can simply just be pulled out.
Need help?
Do you have a question about the EcoDesign Ultrastar Serv60+8 and is the answer not in the manual?
Questions and answers