Ingeteam INGECON SUN STORAGE 1Play TL Use And Settings page 7

Hide thumbs Also See for INGECON SUN STORAGE 1Play TL:
Table of Contents

Advertisement

INGECON SUN STORAGE 1Play
Connect the RJ45 terminal to the connector under the cover named "connection kit", located inside the battery
pack.
Connect the three wires to the inverter in the CAN communication terminal. Use a cable gland provided to
insert the cable within the inverter.
Only for ISS 1Play TL, it is mandatory that its display is connected correctly. Otherwise, the LG RESU will
open its internal circuit breaker after 10 minutes.
Technical Guide
22/04/2020
7/10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ingecon sun storage 1play tl m

Table of Contents