Ingeteam INGECON SUN STORAGE 1Play TL Use And Settings page 6

Hide thumbs Also See for INGECON SUN STORAGE 1Play TL:
Table of Contents

Advertisement

Use this method when making a communication wire to be connected between the LG RESU and the ISS
1Play:
1- Cut a cable shorter than 3 meters long.
2- Strip from 2.5 to 5cm of the outer sheath at the end of the cable
3- Untwist and separate each pair of wires.
4- Arrange the wires in this order:
1) White with an orange stripe
2) Orange
3) White with a green stripe
4) Blue
5) White with a blue stripe
6) Green
7) White with a brown stripe
8) Brown
5- Bring the sorted wires together and trim them to about 1.4cm in length.
6- Hold the RJ45 plug with the copper contact facing up, and insert the wires into the plug, making sure
that they stay aligned and each color goes into its appropriate channel.
7- Put the plug into a network crimper and squeeze the handles until it clicks.
8- For the other end of the cable, crimp a tubular terminal in the following wires:
1) Orange (GND)
2) Blue (CAN-H)
3) White with a blue stripe (CAN-L)
Technical Guide
Figure: RJ45 pinout diagram
22/04/2020
INGECON SUN STORAGE 1Play
6/10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ingecon sun storage 1play tl m

Table of Contents