Table of Contents

Advertisement

Mos GB 1124-1
nIBe
tM
F205P
031977
60
40
°C
20
0
T
G
InstallatIon and MaIntenance InstructIons
NIBE
80
100
120
3
F205P
TM
1 x 230 V uK
1
2

Advertisement

Table of Contents
loading

Summary of Contents for Nibe F205P

  • Page 1 InstallatIon and MaIntenance InstructIons Mos GB 1124-1 NIBE F205P nIBe F205P 031977 1 x 230 V uK °C...
  • Page 2 Fighter 310P Fighter 310P Fighter Fighter 310P 310P Fighter 310P Fighter 310P Fighter Fighter 310P 310P...
  • Page 3: Table Of Contents

    Hard water areas _________________________________ 11 Inspection of the installation _______________________ 11 Maximum boiler and radiator volumes _______________ 11 Installing the clock thermostat _____________________ 12 Pipe connections ________________________ 13 General _________________________________________ 13 Pump and pressure drop diagram _________ 14 Cleaning the system _____________________ 14 F205P...
  • Page 4: General

    For Home Owners section in this Installation and Maintenance Instruction. F205P is an exhaust air heat pump. This means it utilises energy in ventilation air and uses this energy for hot water and heating the house. A microprocessor ensures that the heat pump always works effi- ciently.
  • Page 5: For Home Owners

    For Home Owners System description System description Principle of operation F205P comprises an electric boiler with a stainless steel water heater and a heat pump which recovers energy Extract air Exhaust air Avluft Frånluft from the ventilation air. The recovered energy is supplied to the heat pump.
  • Page 6: Front Panel

    Lower lamp Auto The circulation pump is controlled on and Immersion heater is in operation. off by the control system or clock thermo- Flashing - stat. Not lit Immersion heater is not in operation. Circulation pump in continuous operation. F205P...
  • Page 7: Front Panel, Supplied Clock Thermostat

    Night : In this mode you get the setting for night temperature for the entire day. Manual: (no symbol) In this mode the set tempera- tures are not used. Press to increase or decrease the temperature indoors. F205P...
  • Page 8: Settings

    E.g. You change the 05:00 setting of the clock thermostat If you want one indoor temperature during the daytime from 17 °C to 20°C. F205P starts to increase the tempera- and another indoor temperature during the night select °C...
  • Page 9: Maintenance Routines

    Check that the filter is not damaged. New original fil- ters can be ordered from a Nibe distributor. Re-assembly takes place in the reverse order. The cleaning time intervals vary depending on the amount of dust in the exhaust air.
  • Page 10: Cleaning The Ventilation Devices

    Jättegammal modell Cleaning the ventilation devices Checking the safety valves F205P has three safety valves, one for the heating system and two for the water heater. The heating system safety valve (52) must be completely tight, but the hot water safety valve (47) may release some water after hot water has been used.
  • Page 11: Dealing With Malfunctions

    The fan needs to be cleaned, if it is noisy. Call your installa- • Close valves (44) and (50) in the radiator circuits. tion engineer. • Too low pre-pressure in the expansion vessel, contact the installer. Note! In all correspondence with NIBE state the serial number ______________ F205P...
  • Page 12: Indications On The Display

    After this, the compressor starts automati- cally if heating is needed. Frequent defrosting is a sign of clogged ventilation devices or dirty filters. See ”Maintenance routines” – ”Cleaning air filters”. Note! In all correspondence with NIBE state the serial number Art.nr. 511077 ______________ F205P...
  • Page 13: For The Installer

    The heat pump should be transported and stored vertically Current regulations require the heating installation to be in the dry. The F205P may however be carefully laid on its inspected before it is commissioned. The inspection must back when being moved into a building.
  • Page 14: Installing The Clock Thermostat

    Be sure to connect all the wires as per the wiring diagrams and keep it away from water, mud and other material so as to prevent the unit being spoiled! As per wiring diagram, connect it with terminals, fixed by the screwdriver. F205P...
  • Page 15: Pipe Connections

    70 litres in the boiler section. must be in accordance with the relevant standards and wa- The pressure vessel in the F205P is approved for max 9.0 ter supply regulations. It should also be in accordance with bar (0.9 MPa) in the water heater and 2.5 bar (0.25 MPa) the relevant requirements of the Local Authority and the in the double shell section.
  • Page 16: Pump And Pressure Drop Diagram

    Choose speed I, II or III. You NIBE Energy Sytems Limited recommends Fernox and can see the chosen speed to the left, above the switch. Sentinel water treatment products for heating and cooling The display to the right, above the switch, should not be systems.
  • Page 17: Ventilation Connection

    England and Wales and Chapter 3.4, Scotland. Duct installation F205P is connected so that all ventilation air except the To prevent fan noise being transferred to the exhaust air kitchen fan passes the evaporator (62) in the heat pump.
  • Page 18: Electrical Connections

    Note! The electrical installation, wiring and any L1 N1 PE service work must be done in strict con- formity to current regulations under the supervision of a qualified electrician. VC Val FC Med Hi Clock thermostat Klocktermostat F205P...
  • Page 19: Circulation Pump Control

    Clock thermostat Klocktermostat Immersion heater F205P is delivered with a 3 kW immersion heater (1). It is started and stopped via the microproessor card (34). If a failure occurs there is a temperature limiter (6) (thermal cut-out) that is stopping the immersion heater. An immer- sion heater without a temperature limiter is not allowed to be mounted.
  • Page 20: Commissioning And Adjusting

    (6) has not tripped (press firmly the The flexible hose between connection (149) and con- knob). F205P is supplied with a limiting valve (5) mounted nection (150) must not be connected during opera- on the outlet pipe. This one allows to set a maximum out- tion.
  • Page 21 Start the heat pump with compressor operation. The conditions of warranty, please see our web- compressor can be quick-started by pressing in button site www.nibe.co.uk S202 on the circuit board (34). Adjust the high fan capacity using knob R51. To en- sure the lowest possible noise level, adjust the fan to the lowest possible capacity.
  • Page 22: Temperature Levels

    (S1) to ON. the switch is selected. Periodic increase F205P has a function for periodic increases of the hot wa- ter temperature. The hot water temperature is increased to about 60 °C. Activate the function by setting switch 4 on the dip switch (S1) to ON and by setting switch, hot water prioritisation (25) to Auto.
  • Page 23: Service

    4. Check flow temperatures, the difference shoud be between 5-10° When replacing a part on the appliance, Adjust flow if required. use only spare parts supplied by NIBE. Draining the water heater Note! The siphon principle is used to empty the hot water heater.
  • Page 24: Electrical Circuit Diagram

    For the Installer Electrical circuit diagram Electrical circuit diagram F205P...
  • Page 25 For the Installer Electrical circuit diagram F205P...
  • Page 26 For the Installer Component locations 31 32 Auto 88 6 7 43 Fram- Radiator ledning system radiatorer outlet 66 149 151 71 50 v.v. k.v. Radiator Åter- ledning system inlet radiatorer F205P...
  • Page 27: List Of Components

    151 Filling valve, heating system cw-side 107 Expansion vessel, tap water 108 Tundish from safety valve 109 Tundish from pressure valve 148 Pressure reduction valve 149 Connection for flexible hose to CW-side 150 Connection for flexible hose to heating-side F205P...
  • Page 28: Dimensions

    Lucka på båda sidor Access panel on both sides Undvik rördragning inom streckmarkerat When running pipes in the hatched area område för att underlätta service to facilitate servicing. Principle of dimensioning Copper pipe Compression ring Klämring Cu-rör Klemmring Kupferrohr F205P...
  • Page 29: Enclosed Kit

    A top cabinet is available as an accessory to conceal the ventilation ducts above the heat pump. Part no. 089195 Top cabinet 245 mm. Part no 089 424 Top cabinet 345 mm. Part no 089 426 Top cabinet 385 — 535 mm. Part no 089 428 F205P...
  • Page 30 Cut-out temperature, temperature limiter for immersion heater ° C Cut-out temperature, temperature limiter for compressor ° C Sound power level*** dB(A) 46-50 Sound level in room where installed**** dB(A) 42-46 LW***** dB(A) LWD suction***** dB(A) LWD discharge***** dB(A) Part no. 089 890 F205P...
  • Page 31 *** * A-weighted sound pressure level (LpA). The value varies with the damping capacity of the room. These values apply with a damping of 4 dB. ***** Sound power level according to EN 12102. Rating condition: Air flow, exhaust air 300 m /h. Inlet dry bulb temperature 21 °C. Water outlet temperature 50 °C. F205P...
  • Page 32 EXHAUST AIR HEAT PUMP COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
  • Page 33 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
  • Page 34: Technical Data

    Service Record It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Interval Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.
  • Page 36: Benchmark Checklist

    Tel: +43 (0)7662 8963-0 Fax: +43 (0)7662 8963-44 E-mail: mail@knv.at www.knv.at NIBE Wärmetechnik AG, Winterthurerstrasse 710, CH-8247 Flurlingen Tel: (52) 647 00 30 Fax: (52) 647 00 31 E-mail: info@nibe.ch www.nibe.ch Druzstevni zavody Drazice s.r.o, Drazice 69, CZ - 294 71 Benatky nad Jizerou Tel: +420 326 373 801 Fax: +420 326 373 803 E-mail: nibe@nibe.cz www.nibe.cz...

Table of Contents