Download Print this page

Advertisement

Quick Links

INDUSTRIES
Quick Ship
WORKMASTER WORK BENCHES
IAC INDUSTRIES
3831 S BULLARD AVE., GOODYEAR, AZ 85338
Phone (714) 990-8997 Fax (714) 990-0557
www.iacindustries.com
QS Workmaster
Assembly Instructions
REV. (042318P65)

Advertisement

loading

Summary of Contents for IAC INDUSTRIES Quick Ship WORKMASTER

  • Page 1 INDUSTRIES Quick Ship WORKMASTER WORK BENCHES IAC INDUSTRIES 3831 S BULLARD AVE., GOODYEAR, AZ 85338 Phone (714) 990-8997 Fax (714) 990-0557 www.iacindustries.com QS Workmaster Assembly Instructions REV. (042318P65)
  • Page 2 Table Of Contents Page # Attention Notes Pre-assembly Check List 5 to 6 WM Workbench 7 to 8 Instrument Shelf / Riser Electrical WM Undershelf Light Footrest / Footpan Electrical Strip 12 to14 Drawer / Double Drawer Plate Caster Leg Extender Kit ESD Grounding &...
  • Page 3 WARNING: ALL PARTICLE BOARD USED IN IAC INDUSTRIES PRODUCTS ARE SOURCED ONLY FROM VENDORS THAT ARE CARB ATCM PHASE 2 AND TSCA TITLE VI COMPLIANT WITH VALID CERTIFICATES Drilling, Sawing, Sanding or Machining Wood products can expose you to wood dust, a substance known to the state of California to cause cancer.
  • Page 4 Your bench has been carefully packed at the factory to prevent damage during shipment. Unpack all parts and examine them for damage. Contact your freight carrier for freight claims information if your order was shipped "freight collect" or "pre-pay and add". Contact IAC Industries at 800 989-1422 if parts are missing. HARDWARE KIT QS-HWR0078: 1/4-20x3/4"...
  • Page 5 QS Workmaster Bench Assembly: Step 1: Attach beam connector plates to the ends of the bench support beams using the 5/16-18 x .75 HH bolts and 1/4” flat washers supplied as shown. DO NOT TIGHTEN THE HARDWARE. PLEASE NOTE: If you are installing MTS posts to your 30” deep benches only…make sure to install the MTS T-nuts, shown in the QS MTS Assembly Instructions prior to installing and securing the frame support beams to the work surface.
  • Page 6 QS Workmaster Bench Assembly: (cont) Step 3: Align the workbench pedestals over the ends of the support beams and lower them down over the beam connector plates so that the plates are on the inside of the pedestal tubing. Align the slots in the pedestal support beam over the inserts in the worksurface and thread the 1/4-20 x .75 HH bolts with the 1/4 washers into the inserts.
  • Page 7 QS WM Instrument Shelf: HARDWARE KIT QS-HWR045 Step 1: Place the instrument top upside down on smooth flat surface being sure to protect it from damage by foreign objects. IAC recommends the use of packing type blankets or clean cardboard. Place the riser boxes onto the instrument shelf aligning the slots in the riser boxes with the threaded inserts in the instrument shelf as shown.
  • Page 8 Step 3: Install the riser covers or optional Riser Electrical Panels using (8) # 8 x .375 self-threading screws. Align the riser covers holes with the holes in the riser box and thread #8 x .375 screws into each hole. Tighten at this time. For optional Riser Electrical Panels install 1.5” plastic bushing into the holes located in the rear of the riser boxes.
  • Page 9 QS WM Under shelf Light HARDWARE KIT QS-HWR048 Step 1 Carefully remove the plastic diffuser to expose the inside of the light housing. Align the slots in the light housing over the inserts in the underside of the instrument shelf. Thread 2 each 1/4-20 x 5/8” phillips screws with 1/4"...
  • Page 10 Q.S. Footrest Tube 1. Push and twist the rectangular spring nut into the bottom cross brace of the pedestal legs with the spring pointed towards the closed top of the brace. Make sure the nut is securely seated on the inside lips of the cross brace. 2.
  • Page 11 QS Electrical Strip HARDWARE KIT QS-HWR047 Step 1 Attach the TE2 mounting brackets to the back side of the SEC Electrical Channel using the 1/4-20 x .50 self- threading phillips screws being sure to fit the power cord through the large hole in the bracket. DO NOT TIGHTEN these screws.
  • Page 12 Q.S. Single Drawer Note: Applies to all QS drawer and door cabinet options. HARDWARE KIT QS-HWR015 For easier installation, it is best to install drawer bracket and drawer(s) while bench in upside down. Step 1: Install rear mounting bracket as shown on below drawings using hardware listed above. Note: The position of your bracket will be determined by the size of your front beam.
  • Page 13 Step 3: Remove drawer from drawer case by pulling the drawer body out of the case. Locate the slide release tabs. Lift up on the left side tab and press down on the right side tab and pull on drawer body. Step 4: With the drawer removed from the case, place the case over the front beam and the drawer mounting bracket as shown.
  • Page 14 Before Installing the Drawer Body back into the Drawer Case: Once bench is complete and is in the right side up position you can install your drawer bodies back into the single drawer or cabinets, but before installing the two parts (Drawer body/Drawer Case) of the drawer assembly together you much do the following: 1.
  • Page 15 Q.S. Plate Caster Leg Extender Kit HARDWARE KIT QS-HWR0135 For easier installation, it is best to install the plate caster leg extenders while bench in upside down. Note: If this kit is for an excising bench the leg extenders in that bench will have to be removed. Slide the plate caster leg extender into the pedestal tube making sure the threaded holes on the plate caster leg extender tube are on the same side as the holes in the pedestal tube.
  • Page 16 ESD GROUNDING HARDWARE KIT QS-HWR 014 and QS-HWR 122 Step 1 Note: do not use power tools for this installation For ESD worksurfaces and instrument shelves to dissipate static electricity they require the connection of a ground cord to an earth ground. IAC install grounding studs on each rear corner of all ESD worksurfaces and instrument shelves.