Download Print this page

IAC INDUSTRIES Quick Ship ISLES WORKMASTER Assembly Instructions Manual

Advertisement

Quick Links

INDUSTRIES
Quick Ship
ISLES WORKMASTER
Assembly Instructions
IAC INDUSTRIES
895 BEACON STREET BREA, CA 92821-2926
Phone (714) 990-8997 Fax (714) 990-0557
www.iacindustries.com
Rev (092105)

Advertisement

loading

Summary of Contents for IAC INDUSTRIES Quick Ship ISLES WORKMASTER

  • Page 1 INDUSTRIES Quick Ship ISLES WORKMASTER Assembly Instructions IAC INDUSTRIES 895 BEACON STREET BREA, CA 92821-2926 Phone (714) 990-8997 Fax (714) 990-0557 www.iacindustries.com Rev (092105)
  • Page 2: Tools Needed

    Unpack all parts and examine them for damage. Contact your freight carrier for freight claims information if your order was shipped "freight collect" or "pre-pay and add". Contact IAC Industries at 800 989-1422 if parts are missing. PRE-ASSEMBLY PARTS CHECK:...
  • Page 3 BASIC BENCH ASSEMBLY INSTRUCTIONS NOTE: YOU'LL BE WORKING WITH THE LAMINATE SIDE OF THE WORKSURFACE FACING DOWN. BE SURE TO LAY THE WORKSURFACE ON A FLAT SMOOTH SURFACE DURING ASSEMBLY TO AVOID DAMAGING THE WORKSURFACE. STEP 1 - INSTALL THE SUPPORT BEAMS. (Item 6) THE BOTTOM OF THE WORK SURFACE HAS THREADED INSERTS INSTALLED IN IT.
  • Page 4 STEP 2 - ATTACH BEAM CONNECTOR PLATES AT EACH END OF THE BEAMS. THREAD THE LARGER HEX HEAD 5/16-18 X 3/4” BOLTS (Item 3) WITH 1/4” FLAT WASHERS (Item 2) THROUGH THE HOLES AT THE ENDS OF THE BEAMS A FEW THREADS INTO THE BEAM CONNECTOR PLATES. THESE MUST BE LOOSE AT THIS TIME.
  • Page 5 STEP 4 - INSTALL THE LEG EXTENDERS. INSTALL THE FLOOR GLIDES INCLUDED IN THE HARDWARE KIT INTO THE BLACK PLASTIC INSERT IN THE END OF THE LEG EXTENDERS. HOLDING THE LEG EXTENDER BY THE FLOOR GLIDE, PLACE THE EXTENDER INSIDE OF THE END SECTION PEDESTAL LEGS SO THAT THE ROW OF THREADED HOLES IN THE SIDE OF THE EXTENDER ALIGN WITH THE TWO HOLES IN THE INNER PORTION OF EACH LEG.
  • Page 6 QS SB / WM INSTRUMENT SHELF (HWR 045) (Refer to FIGURE 6 ) PRE-ASSEMBLY PARTS CHECK: HARDWARE TEMPLATE:...
  • Page 7 STEP #1- INSTALLING RISER BOXES TO LAMINATE SHELF. With Laminate shelf still in the shipping box to protect the shelf, attach Riser boxes to the Laminate Shelf making note that the Riser Box flange is facing away and out from the shelf and securing with four (4) sets of 1/4-20x3/4"...
  • Page 8 STEP #4- INSTALLING RISER BOX COVERS. Push the small end of the rubber, threaded inserts (plastic, 6-32 blind nuts) into each riser box (12 Places) to be used to attach the riser box covers. Attach riser box covers to the Riser Boxes using six (6), 6-32x1/2" Phillips head screws.
  • Page 9 QS WM UNDERSHELF LIGHT ( HWR 048 ) If you are installing the optional WM UNDERSHELF LIGHT, remove the plastic diffuser cover. Attach light casing to the 2 pre- drilled holes in the underside of the shelf using the 2 sets of 1/4- 20X5/8”...
  • Page 10: Grounding Cautions

    ESD GROUNDING (Bench HWR 014, Instr. Shelf HWR 122, Personnel Grd HWR 019. ) ESD refers to the OPTIONAL static dissipative laminate used on the bench. The laminate has a conductive layer that comes in contact with the factory installed grounding bolts in the worksurface. The ESD grounding kit, including the 10 ft.
  • Page 11 ESD GROUNDING (cont) NOTE: If benches are moved to another location, the ground bolts in the worksurfaces should be re-tested. Refer to EOS/ESD document S4.1- 1990 Worksurfaces-Resistive Characterization for proper testing methods. If ground has been disturbed between the bolt and the static dissipative laminate, DO NOT OVER TIGHTEN ground bolts to achieve proper ground.