Remove Inlet Union From Unit; Gas Connection Position; Run Gas Supply - Rinnai SPECTRUM 28 REH281 EB Operation & Installation Manual

Radiant /convector space heater
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS (INBUILT)

REMOVE INLET UNION FROM UNIT

The inlet union/elbow should be fitted to the end of
the copper supply tube before installing the heater
in the fire place opening.
For access to union:
Remove bottom louvre panel, 2 screws in the lower
right and left hand corners of louvres.
Remove upper front panel, 2 screws at the bottom
right and left hand edges of the panel. Lift panel to
disengage top and remove from heater.
Don't lift the panel by the dress guard or top louvres.
REMOVE UNION.
ENSURE THAT REMOVAL AND RE PLACEMENT
OF THE BOTTOM PANEL IS NOT OBSTRUCTED
BY CARPET ETC.

GAS CONNECTION POSITION

Drawing is viewed from rear of heater. Actual
connection is on Right Hand Side from front.
Dimensions are to the centre of the flare fitting on
the inlet elbow/union.
FLARE FITTING SUITS 15mm COPPER.

RUN GAS SUPPLY

Refer to A.G.A. Pipe sizing chart if in doubt about
size of gas line.
Copper supply should be run leaving a flared
connection the position shown.
Connect the union/elbow fitting to the copper supply
with the union nut facing upwards.
PURGE SUPPLY OF AIR AND SWARF
All foreign materials such as filings must be purged
from the gas supply, as they could cause the gas
valve to malfunction.
DON'T FORGET TO PUT FLARE NUT ON TUBE
BEFORE FLARING.
Rinnai
19
REH281 - SPECTRUM 28 OIM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spectrum 28 reh281 ec

Table of Contents