JUKI KE-2000 Series Installation Manual page 15

Table of Contents

Advertisement

2. Loosen
three
socket head bolts of each
adjuster.
(Make sure that the adjust
foot moves freely.)
3. When
the
adjusters
raised from adjuster (1), (3),
(2), (4), (1), and so on in
that
order,
this
relatively smooth raising of
the machine level.
4. Level the machine in the
back and forth direction.
Put a level vial in the state
shown by dotted lines and
move the vertically adjusters
(1) ・ (2)、 (3) ・ (4) in that order
so that the scale on the level
vial shows the set value stated in the level setting table (supplied with the machine) ± 1.
The transport height is adjusted to 900 mm for domestic models and 950 mm for
overseas models.
Base bar R
Level vial
Viewed from the top
KE2000 Installation Manual
hexagon
are
ensures
Base bar B
Base bar F
Fig 4-1-5
Viewed from the bottom
Fig 4-1-4
5.Next, level the machine in the
horizontal direction.
vial
in
continuous lines and vertically
move the adjusters (1)・(4)、(2)・
(3) in that order so that the scale
on the level vial shows the set
value stated in the level setting
table (supplied with the machine)
± 1.
6.Repeat above steps 4 and 5 to
level the machine so that the level
on the base bar B enters the
standard range.
(The scale of the level vial to be used
for this adjustment is 0.05/div.)
11
Put a level
the
state
shown
by

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ke-2010Ke-2020Ke-2030Ke-2040

Table of Contents