5.2
Parallel Interface Board (IFAU-09*)
M4 hole
to connect ground wire
Step 2-1
Screw spacers (#12) x 9pcs
with spring washer (#16) and
flat washer (#17) on the plate.
#12: Spacer
G2020 MMS KIT Installation Manual – 4GBH0111A
Inside of landing cabinet
Ground bus bar
(Side)
Example of 750kVA
Figure 5-4 Location of parallel interface board (IFAU-09*)
Figure 5-5 Parallel interface board (IFAU-09*) installation procedure
Through hole
Ground bus bar
(Upper)
M5 x 2 holes
to mount a panel
M3 x 9 holes for spacers
to install parallel interface
board (IFAU-09*)
Step 2-2
Install the parallel interface
board IFAU-09*(IF1, #1)
on the spacers with M3 screws (#13).
#1: IOAU-09*
#13: M3 Screw
IF1
11