Turning On the Power
1. Reattach all cords and cables connected to the system unit.
2. Turn on the power in this order:
External SCSI peripheral with SCSI terminator attached
External SCSI peripheral daisy-chained to the SCSI peripheral with the SCSI
terminator attached
Monitor
Power On/Standby switch on the system unit back panel.
3. The operating system should load or the ok prompt should appear on the monitor.
FIGURE 3-10
3.4.4
Power-On Self-Test (POST)
For a full description of the Power-On Self-Test (POST), refer to the Sun Ultra 2
Service Manual.
3.4.5
EnergyStar
If you experience RED State Exception failures when exercising EnergyStar
suspend/resume functions on Solaris 2.5.1 releases prior to Solaris 2.5.1 HW 4/97,
install patch 104729-01.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Power On/Standby Switch
Chapter 3
Installing the UltraSPARC-II Module
3-11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ultra 2 UltraSPARC-II and is the answer not in the manual?

Questions and answers

Table of Contents