Position Of Electrodes; Combustion Head Setting; Rotation Of Fan Motor - Riello RS 300/E BLU Installation, Use And Maintenance Instructions

Gas burners, modulating operation
Table of Contents

Advertisement

(A)
3
2
1
D3093
(B)
N° Hole
3
RS 300/E BLU
2
1
0
NCV
NCV
4095
5459
GCV
GCV
4545
6060
N° Hole
3
2
1
0
NCV
NCV
2730
3412
4095
5459
GCV
GCV
3030
3787
4545
6060
(D)
(E)
Ignition pilot
0
4
6824
8189
9554
10919
12283
7575
9090
10605
12120
13635
Max burner output
6824
8189
9554
10919
12283
7575
9090
10605
12120
13635
Max burner output
Electrode
D3802
D3409
(C)
RS 400/E BLU
13648
15012
MBtu/hr
MBtu/h
15150
16664
RS 500/E BLU
13648
15012
16378
17743
MBtu/h
MBtu/hr
15150
16664
18179
19694
D3777
5
4
3
2
1
D3803
8
POSITION OF ELECTRODES (A)
Make sure that the electrode and the ignition
pilot are positioned as shown in figure (A).
COMBUSTION HEAD SETTING (B)
In addition to varying air flow depending on the
output requested, the air gate valve servomotor
4)(A) pag. 4 - by means of a lifting assembly -
varies the setting of the combustion head.
This system allows an optimal setting even at a
minimum firing rate.
For the same servomotor rotation, combustion
head opening can be varied by moving the tie
rod onto holes 1-2-3, fig. (B).
The choice of the hole (1-2-3) to be used is de-
cided on the basis of diagram (D) against the re-
quired maximum output.
Setting is pre-arranged in the plant for the maxi-
mum run (hole 3).
When dealing with boilers featuring a strong
back pressure, if air delivery is insufficient even
with the damper fully open, you can use a differ-
ent setting to that illustrated in diagram (D) - do
this by moving the tie rod onto the next highest
hole numerically speaking, thus increasing the
combustion head's opening and hence air deliv-
ery.
If combustion requirements require you to move
st
spacer (1) fig. (C) onto the 1
gear and, at the same time, the hinge is on the
right, you need to fit the spacers (4) fig. (C)
supplied with the burner.
Proceed as follows (fig. C):
- first unscrew nuts (2), remove tie rod (3),
unscrew spacer (1) and position it on the hole
you want,
- screw the spacers (4) onto spacer (1) and
screw (5) respectively,
- once done, refit the tie rod and nuts.
For operation on flame-reversal
boilers, gas pipes must be adjusted
to hole position 4, see Fig. (E).

ROTATION OF FAN MOTOR

Look at the fan motor's cooling fan from the front
and make sure it turns anticlockwise.
nd
or 2
hole of the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 400/e bluRs 500/e ln

Table of Contents