6 COMMISSIONING AND MAINTENANCE

6.1

Repositioning the front panels

Before putting the appliance into service, make sure that all the
thermal modules have been reassembled with their own front
panel:
1
Insert the panel into the seats on the points (B).
2
Push it forwards until contact is made and then secure
using the designated screw (A).
B
1
A
2
B
6.2

Putting the system into service

The first time the Condexa PRO is used, the following checks and
operations must be carried out:
− Check that the gas cock and heating water cock are open
− Check that the pressure of the hydraulic circuit when cold
is always greater than 1 bar and less than the maximum
limit permitted for the system
− Set the main switch of the system to ON and the main
switch of all the thermal modules to (I), starting with the
Managing thermal module.