Trolley Electric Chain Hoist CPE/F Travel motor Electric control Suspension pin retainer Suspension pin Centre traverse Roll pin Chain hoist Buff er Chain end stop Load chain 11 x 31 Buff er Bottom block Pendant control Safety latch Load hook Fig.
Attaching the load Maximum capacity Inspect the traverse (for trolleys) The Yale electric chain hoist series CPE/F has been designed to lift Check adjustment of trolley width and lower loads up to the rated capacity. The lifting capacity indicated Traversing the trolley...
Electric Chain Hoist CPE/F Temperature range The units can be operated in ambient temperatures between -20° C and +50° C. Consult the manufacturer in case of extreme working conditions. Theoretical service life The electric chain hoist is classifi ed to group 1 Am according to FEM 9.511.
Electric Chain Hoist CPE/F In 1-strand configuration the suspension hook is to be installed centred Assembly of the trolley 1,6 - 5 t (see Fig. 10) on the marking "1/1" on the main frame assy. , in 2-strand configuration 1. Unscrew the locking nuts (item 9) and hex nuts (item 2) from the centred on the marking "2/1",...
7. Raise the complete pre-assembled trolley to the carrying beam. Shortening or extending the hand chain (Model CPE/F with hand chain drive only) 8. Engage the second side plate (item 6) ensuring that the roll pins (item The length of the hand chain should be adjusted so that the distance to 8) engage into one of the bores in the round nuts (item 5).
Electric Chain Hoist CPE/F 4.4 ELECTRICAL CONNECTION 2. On chain hoists with an electric trolley (CPE-VTE) the three phases of the mains supply are to be connected to the terminal strip within the Attention ! terminal box on the trolley. The ground/earth wire is to be connected...
Electric Chain Hoist CPE/F 5. FUNCTIONAL CHECK AFTER ASSEMBLY Inspection before starting work Before starting work inspect the hoist/trolley, chains and all load bearing Prior to operating the hoist, grease the trolley pinions (manual geared components every time for visual defects. Furthermore test the brake...
Attach the load to the hoist using only approved and certifi ed slings or • The Yale electric chain hoist CPV/F conform to FEM group 1 Am in lashing devices. Never use the load chain as sling chain. The load must accordance with FEM 9.511.
The load chains are case-hardened and carry the designations 11 x 31 DAT. Replace the load chain The CPE/F electric hoists are specially designed to use this type of chain. 1-strand design For this reason only chains that have been approved by the manufacturer 1.
8. Before initial operation lubricate the unloaded chain and test all hoist The following lower limits are to be obtained: functions under a no-load condition. CPE/F 16 / 20 CPE/F 32 / 40 / 50 CPE/F 25 / 30 CPE/F 75 / 100 Inspection Dim.
Electric Chain Hoist CPE/F 8.5 MAINTENANCE TROLLEYS Disassemble the gear cover (item 51) by removing the cylinder screws (item 52). and unscrew the screw plug (item 44). Place the hoist hori- In particular check following parts: zontally and turn so that the oil can drain from the fill hole into a suitable •...
Electric Chain Hoist CPE/F Reassemble the gearbox 5. Evenly tighten the binding screws B14. Please tighten first screw Reassemble the gearbox in the reverse order strictly in accordance with placed opposite of the fitting key (for the permissible torque consult the sectional drawing.
Page 14
Electric Chain Hoist CPE/F Inspection Chart Inspection before initial operation: Date of initial operation: Regular Inspections Date Findings Repair Test Date by * * competent person...