11.5.8
STEP 7, Step VIII: Modifying and Loading Organization Blocks
Initial situation
The fault-tolerant system is working in redundant system mode.
Procedure
1. Make sure that the interrupt OBs 4x and 82 no longer react to interrupts from
the removed components.
2. Load the modified OBs and the program segments affected by these into the
PLC.
Result
The fault-tolerant system is working in redundant system mode.
Automation System S7-400H Fault-tolerant Systems
A5E00068197-07
Modifying the System During Operation
11-39