4. (Optional) Install signal cables for non-P&E cameras.
Dome camera 1
Bullet camera 1
6. (Optional) Install the door status sensor.
5. (Optional) Install power cables for non-P&E cameras.
Dome camera 2
Bullet camera 2
Cable distribution terminal
7. (Optional) Install the dome camera alarm linkage cable.
The alarm cables of the two dome cameras can be connected to
the door status sensor. Select one dome camera for connection
according to the actual situation.
6
NOTICE
The power cable for the dome camera can only be connected to
the 24V AC port.
One PC500-300G1 can supply power to one non-P&E dome
camera.
Use waterproof tape to protect the cable distribution terminal
and put it inside the pole.
Bullet camera 1
NOTICE
Dome camera
Bullet camera 2
Dome camera
alarm cable