Huawei PowerCube 500 Quick Manual page 2

Kenya safe city
Hide thumbs Also See for PowerCube 500:

Advertisement

2
Tools
3
Routing Cables Through the Pole
1. Place the pole on a wooden case or a similar object.
2. Route a pull wire.
3. Route cables.
NOTE
The cables routed from the pole cable hole have a
length of 1.5 m reserved. The cables routed from the
cantilever cable hole have a length of 0.5 m reserved.
The object where the pole is placed should be able to
bear a load above 700 kg.
Cables
Mains AC cable and optical fiber
Module ground cable
Camera ground cable
Dome camera signal cable, power cable, and alarm cable
Bullet camera signal cable, and power cable
Inlet
1
2
4
6
7
9
4
9
6
7
2
Outlet
3
3
5
5
8
8
3
3
3
3