Honeywell TotalPlant LCN System Installation page 26

Table of Contents

Advertisement

6. Insert a Flexible Spacer, Bottom Inline, 51308038-100, between the two lower
monitors as shown in Figure 3-7. The spacer fits in the groove behind the bezel,
on both stations, with the top even with the middle of the CRT Mount (wedge.)
7. Upper Monitors:
If there is an upper monitor in both stations, and they are tilted forward, insert a
Flexible Spacer, Bottom Inline, 51308038-100, between the two upper
monitors.
8. Bolt the second station to both complexing tie plates.
LCN System Installation
3-10
3.5.2
9/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents