15

CONSOLE GLOBAL USER STATION

Section 15
Provides for the installation of the Global User Station in new console furniture.
Use ESD
Wrist Strap
Use an ESD Wrist Strap grounded to the Electronics chassis when
ESD Wrist Strap
connecting or disconnecting cables.

15.1 PREINSTALLATION

Before starting to install the Global User Station hardware, the LCN cables, Cable A, and
Cable B must be installed to the location of the Global User Station unit. The T-connectors
must be located directly below the location of the Global User Station Electronics. The
cable must allow enough length to reach into the footrest and connect to the LCN MAU.

15.2 PLACEMENT

A Global User Station in console furniture can be installed as an integral part of a console
by following the instructions for complexing stations together as a console as described in
subsection 3.5.

15.3 GROUNDING

Connect the safety ground connection to the station as described in Section 4.

15.4 AC POWER

Connect the ac power as described in Section 5.
LCN System Installation
15-1
9/96