Projecta WORKSHOP HDBC21 Manual

Projecta WORKSHOP HDBC21 Manual

Advertisement

Quick Links

WORKSHOP

BATTERY CHARGER

HDBC33
P/No HDBC21 & HDBC33

Advertisement

Table of Contents
loading

Summary of Contents for Projecta WORKSHOP HDBC21

  • Page 1: Battery Charger

    WORKSHOP BATTERY CHARGER HDBC33 P/No HDBC21 & HDBC33...
  • Page 2: Important Safety Information

    IMPORTANT SAFETY INFORMATION Please read this manual thoroughly before use and store in a safe place for future reference. WARNING • Explosive gases. Prevent flames and sparks. Provide adequate ventilation during charging. • Before charging, read the instructions. • For indoor use. Do not expose to rain. •...
  • Page 3 CHARGING & ENGINE START INSTRUCTIONS STEP 1 – CHECK THE ELECTROLYTE LEVEL Prior to charging the battery, remove the vent caps and check the electrolyte level. (Not required on sealed & maintenance free batteries). The electrolyte should be 6mm (1/4”) above the battery’s plates. If low, top up the electrolyte with distilled water to the correct level and refit the vent caps.
  • Page 4 FUSE CHARGE NORM ENGINE BOOST START WORKSHOP 1400 BLACK 12 VOLT 14 AMP BATTERY CHARGER WITH ENGINE START FUSE 2 x 30A Connection in vehicle (positively earthed) Positively earthed Connect the BLACK lead (battery clip) from the charger to the Negative (-) battery terminal. Connect the RED lead (battery clip) from the charger to the vehicle’s chassis away from the fuel line or moving parts.
  • Page 5: Specifications

    STEP 6B – ENGINE START a. Allow the charger to boost charge the battery for 5 minutes (refer Step 4 “BOOST”). b. Switch the Charge/Engine Start switch to ENGINE START and turn the ignition key to start the engine. c. If the engine fails to start after 3 seconds, wait 2 minutes before attempting to start the engine again. Note: Do not repeat this operation more than 5 times.
  • Page 6: Product Overview

    PRODUCT OVERVIEW Charge Meter Input Fuse Charge/Engine Start Switch Normal/Boost Switch 12/24V Output Terminals Fuse (HDBC33 only) On/Off Switch...
  • Page 7: Frequently Asked Questions

    A. A. The Charge Meter’s needle will decrease towards the left. A fully charged battery is indicated by a very low reading. Refer to STEP 6A for an illustration of the Charge Meter. Alternatively use a Battery Hydrometer (Projecta Part No. BH100). A reading of 1.250 or more in each cell indicates a fully charged battery.
  • Page 8 Distributed by AUSTRALIA Brown & Watson International Pty Ltd Knoxfield, Victoria 3180 Telephone (03) 9730 6000 Facsimile (03) 9730 6050 National Toll Free 1800 113 443 NEW ZEALAND Narva New Zealand Ltd 22–24 Olive Road PO Box 12556 Penrose Auckland, New Zealand Telephone (09) 525 4575 IS152...

This manual is also suitable for:

Workshop hdbc33

Table of Contents