Single Phase Current And Voltage - Gemini Tinytag Energy Logger Technical Manual

Table of Contents

Advertisement

11
Modes of Operation:

Single Phase Current and Voltage

Set-up
For monitoring single-phase current with a voltage reference.
In this mode the logger will be powered from the mains, and
will be able to log for six weeks before it fills its memory at
the default five minute logging interval.
Instructions
Select the wiring configuration to be monitored
by pressing the function button.
Follow the on-screen prompt and plug in:
The mains cable.
The L1 coil.
Clip the coil around the correct conductor.
Wait for the logger to configure.
Read values from the screen, pressing the scroll
button to step through the current, voltage and
power readings.
Data Logging
Press and hold the Record button until the logger
confirms it is recording.
16

Advertisement

Table of Contents
loading

Table of Contents