Modes Of Operation; Single Phase Current - Gemini Tinytag Energy Logger Technical Manual

Table of Contents

Advertisement

09

Modes of Operation:

Single Phase Current

Set-up
For monitoring single-phase current where no mains
connection is available.
In this mode the logger will be powered by its batteries, and
will be able to log for a minimum of two months.
Instructions
Select the wiring configuration to be monitored
by pressing the function button.
Follow the on-screen prompt and plug in the L1 coil.
Clip the coil around the correct conductor.
Wait for the logger to complete a self check.
Read current from the screen.
Data Logging
Press and hold the Record button until the logger
confirms it is recording.
14

Advertisement

Table of Contents
loading

Table of Contents