JLG Metro-Led Operation And Safety Manual page 24

Model lighting tower
Table of Contents

Advertisement

MACHINE PACK-UP INSTRUCTIONS
Pack-up the lighting tower by completing
the lighting tower set-up steps in reverse
order.
Before coupling the lighting tower drawbar
to the tow vehicle's hitch;
Ensure the trailer parking brake is applied
and prevents the trailer from moving.
1. Ensure the mast is lowered and the
lighthead is tilted and rotated into the
stowed position prior to towing or
transporting.
2. Extend the jockey wheel to contact the
ground and lock its height in position.
3. Retract
all
outrigger
front and rear outrigger arms fully-in.
Make sure all plunger-pins engage
and lock the outrigger arms.
4. Fold-up all jack winding levers and turn
handles inward towards jack body as
shown.
Section 1
METRO-LED
MACHINE OPERATION
5. Depress the emergency-stop button
legs.
Slide
Emergency-Stop Button (circled)
The machine can be moved onto a truck
tray, into a container or prepared for
towing.
If the machine is attached to a towing
vehicle, ensure that the jockey wheel is
raised and locked in the stowed position.
When loading the machine onto a tilt-tray
truck, do not winch the machine while it is
supported by the jockey wheel. Lateral
forces can cause the jockey wheel to
collapse resulting in machine damage.
When transporting the machine on a tray
of a truck or the floor of a container,
ensure that the front outriggers are resting
on the floor prior to tying down the
machine so as to remove the load on the
jockey wheel and prevent potential failure.
Page 1-20
1001206597

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents