Checking Components - Huawei OceanStor T Series Quick Installation Manual

Hide thumbs Also See for OceanStor T Series:
Table of Contents

Advertisement

1 Installation Preparations
1a
Checking installation tools
The following installation tools are required:
 Phillips screwdriver (M3 to M6)
 Flat-head screwdriver (M3 to M6)
 Diagonal pliers
 Floating nut mounting bar
1c

Checking components

NOTE
 Data switches are optional for controller expansion. All contents involving data switches are optional.
 2 U controller enclosures support two types of disks, 12-slot 3.5-inch disks and 24-slot 2.5-inch disks.
 The Packing List contains all materials required by the installation. The bag containing the Packing List
is attached to the outside of the carton.
Controller enclosure (2 U)
Disk enclosure (4 U)
Data switch (1 U)
Installation template
Front panel of a 4 U
(for 4 U devices)
disk enclosure
Installation template
Front panel of a 2 U
(for 2 U devices)
controller enclosure
Mini SAS cable
AOC cable
1b
Checking circuit breakers
NOTICE
To protect devices connected to the storage system from
unexpected power-off caused by a power failure, the
current of the AC power circuit breaker is 16 A.
Adjustable
Floating nut
guide rails
and M6 screw
mini SAS HD cable
Mini SAS HD to
Multi-mode optical
mini SAS cable
fiber cable
3
File engine (4 U)
Disk enclosure (2 U)
High-density disk enclosure (4 U)
Bearing guide rails
Network cable
Cable manager
Ground cable

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents