Download Print this page

Keysight N5241BU-622 Installation Note page 23

Add 4-port capability upgrade kit to upgrade pna-x n5241b, n5242b or n5249b option 222 to option 422

Advertisement

Installation Procedure for the Upgrade
Step 16.Install the LED Boards and Test Port Coupler Assemblies to the Test
Set Front Plate
1. Remove two screws from each LED board and remove the boards from the 2-port test set front
plate of the PNA.
2. If your analyzer's serial number is MY/SG/US5321 and above:
Remove the bulkhead connectors from the 2-port test set front plate of the PNA. They will be
installed later in the 4-port test set front plate.
3. Remove the 2-port test set front plate from the test set deck. The bulkhead connectors may be
discarded since they are not used in a 4-port configuration.
4. Follow the two instructions shown in
Figure 9
LED Board Assemblies and Test Port Coupler Assemblies Installation
23
Figure
9.
Installation Note N5242-90123

Advertisement

loading

This manual is also suitable for:

N5242bu-622N5249bu-622