Installation; Introduction; Installation Preparation; Equipment Wiring And Connection - Sencore Impulse User Manual

Hide thumbs Also See for Impulse:
Table of Contents

Advertisement

2 Installation

2.1 Introduction

This chapter contains the information for technicians installing the equipment.

2.2 Installation Preparation

Before Starting
Make sure that the device is in good condition and that you have the cabling needed to
complete the installation.
Unpacking and Inspecting the Housing
While unpacking the unit, inspect it for shipping damage. If any damage is found,
contact dealer or customer service representative.

2.3 Equipment Wiring and Connection

2.3.1 Power Connection

Use of proper power connection is vital to the safe operation of the device. Only
use the supplied power connector or one with equal specifications.

2.3.2 Connection Setup for Web Management

Connect to the device's management port with a CAT5 or better cable and set up a
management network with a computer connected to the same network or directly to
the impulse.

3 Operation Guide

3.1 Powering Up and Initialization

Connect the supplied transformer to the unit and proper power source. The unit will
begin the boot up process which may take more than 1 minute.

3.2 Operating the Front Panel Interface

The Impulse can be controlled using the front panel. The "OK" button responds
similar to enter or save, the "Menu" button responds similar to a back button. The
Left, Right, Up, and Down arrows can be used to navigate selections.

3.3 Operating the Web Interface

3.3.1 Access Interface PC Web-UI

Impulse can be accessed and configured via web UI. The instructions are as follows:
1) Connect the Impulse to a management PC/server directly, or to a network switch.
8

Advertisement

Table of Contents
loading

Table of Contents