Download Print this page

Frame Border Installation - Principal LED STREET WRAP Installation Manual

Hide thumbs Also See for STREET WRAP:

Advertisement

FRAME BORDER INSTALLATION

EXAMPLE: 104" x 196"
Mounting
Screw
1/4" Gap for
expansion
End Cap
attach with
caulk
TOP LEFT, TOP VIEW DETAIL
BOTTOM LEFT DETAIL
3 Brackets Per Street Wrap
Eq.
3"
Always ensure
drain holes are
on bottom side.
Add holes to the
center of a run
less than 8 feet.
Track
Mounting
Bracket
Always seal
drain holes
with
on verticals
when present.
1/4" Gap Typ. for expansion
Eq.
3"
End caps
attach with
Silicone.
Add Drain Holes
on bottom of
Vertical Runs
Cable Hole
Mounting Bracket
Low Voltage Cable
Angle Brackets
below vertical runs
to prevent sliding
Drain Holes
BOTTOM RIGHT DETAIL, SIDE VIEW
Silicone
End Cap
& Notch
Caulk Under
Rain Shield
Use a screwdriver
if needed to insert
Angle
rain shield into the
Bracket
bracket.
BOTTOM RIGHT DETAIL, PROFILE VIEW
SEC. 6
V-Notch
Drain
Holes
PL TC
Cable
6

Advertisement

loading